Land Registry publishes guide for future contractual-control reporting
The October 26 guidance announcement explains requirements scheduled for April 6, 2027, for certain registered-land agreements in England and Wales.
What the record says
HM Land Registry says its new practice guide 84 explains the scope, required information and digital submission process for contractual-control rights over registered land. Its announcement says certain option agreements, conditional contracts and pre-emption rights will fall under requirements from April 6, 2027. The digital submission service is planned for the same date, with public release of contractual-control data expected from April 2028.
Source details and supporting locations.
Practical next step
Property professionals can review practice guide 84 and the official scope and transition instructions when preparing affected transactions.
Limits and what is not established
The reporting requirements and digital service are prospective. This summary does not determine whether an individual contract falls within scope or replace the full regulations and professional advice.
Sources checked October 26, 2026. Later notices may change instructions or arrangements.
Original sources
HM Land Registry: original information